Pattern Corrections
Gathering
ANYA (pg 34)
FRONT
Cast on 76(92,100,108) sts. . . work rib for 12 cm, ending on a WS row and inc 6(0,0,2) sts across last row worked.
CELESTE (pg 35)
FRONT
Before Shape Neck, the line should read: "measures 56 (56, 58, 58)cm, ending on a WS row." NOT 50 (50, 52, 52)cm.
BACK
"Work as for front until length measures 57(57,59,59)cm" NOT 53 (53, 55, 55)cm.
IMOGEN (pg 40)
Front and back rib should be worked for 8cm.
NINA (pg 44)
TEXTURE PATTERN
Row 1 (RS) K1, * yf, P3tog without slipping sts from left hand needle, yb, K the same 3 sts tog still leaving them on the left hand needle, yf, P the same 3 sts tog and now slipping them off the needle, yb, K1; rep from * to end.
Row 2 (WS) Purl
FRONT
7th row down - replace 15(15,14,13)cm with 15(15,17,17)cm
15th row down - replace 43(43,45,45)cm with 45(45,47,47)cm
23rd row down - replace 2(2,0,0)rows straight with 4(4,4,4) rows. and add (adjust length here if necessary).
ZOE (pg 45)
Yarn Quantities - number of balls of mohair should match the quantity of Silkroad Aran.
MAKING UP Neckband. . . pick up 64(64, 72,72) sts etc .
Page 29 Photos -Version 1 should read version 3 and version 3 should read Version 1
Page 45 Photos -shows Version 3 & 1
JENNY HATS (pg 46)
MOSS ST Row 2: K the P sts and P the K sts as they face you.
THANDI SCARVES (pg 47)
Rows 11 and 13: K2tog, *K2, yon, K1, yon, K2, sl1, K2tog, psso; rep from * to last 8 sts, K2, yon, K1, yon, K2, sl1, K1, Psso, K1.